Clean Energy & Solar Power
Victoria Island, Lagos
Commercial Solar Microgrid Installation (45kVA Hybrid Backup)
Posted by GROPEX Chief Administrator • Deadline: Rolling Evaluation
Target Budget
β¦0 - β¦0
Scope of Work & Requirements
Engineering brief: Design and commissioning of a 45kVA 3-phase commercial solar hybrid setup for a medical diagnostic laboratory with Tier-1 lithium storage and remote cloud telemetry.
πΌ
Submit Proposal / Bid
Direct & confidential submission
All proposals are backed by GROPEX verified dispute resolution safeguards.